Waste processing plant – LOBBE Werndorf

Customer: LOBBE waste disposal GmbH

Period: 1996 - 2001

The site Werndorf of the LOBBE waste disposal GmbH was newly built as a pilot project for a modern waste management. With the units organic splitting of oil emulsions, evaporation, chemical-physical treatment for inorganic and organic liquids, a waste oil incinerator and a connected storage area, where the VCI-system has been applied, several new approaches have been implemented. The wastewater treatment up to direct discharge quality was based on ultrafiltration and reverse osmosis.

EnviCare® Engineering GmbH
engineering consultant for process technology

Eisteichgasse 20/36

8042 Graz, Austria
Tel. +43-316-381038-0 Fax+43-316-381038-9
e-mail: envicare@utanet.at

Contact us

Please leave this field empty.