Biogas plant Maria Lankowitz

Customer: BIG Bundesimmobiliengesellschaft

Period: 2012 - 2014

For the penitentiary Maria Lankowitz and for the Austrian real estate management company we designed and managed the modernization of the oldest Styrian biogas plant that has been built in 1984. All engineering steps from preliminary draft study until commissioning were done by us.

The food waste processing plant includes also a hygienization unit and utilizes all residues from the farm. The goal is not only to provide a significant amount of energy which is necessary for heating all buildings but also to supply electric energy and also feed the surplus into the public grid.

The project was particularly challenging due to the close neighborhood and because of the institution character.